Pöyry was assigned the feasibility and final design studies for Hydropower projects in Turkey
The combined installed capacity of all 4 projects is around 735 MW with an annual generation of 2.246 GWh.
Source: Pöyry press release 29 July 2014
The combined installed capacity of all 4 projects is around 735 MW with an annual generation of 2.246 GWh.
Source: Pöyry press release 29 July 2014