Skip to main content

Detail – Energy Country Profile

CEF funds granted to strengthen the Energy Union

On the sideline of the PCI Energy days from 3-4 December 2019 in Brussels, Connecting Europe Facility (CEF) grants were allocated to create studies for the development of the Harmony Link Interconnector between Lithuania and Poland in the value of €10.29 million.

The action is a part of the synchronization of the Baltic States' electricity network with the European system.

More information can be found at: https://ec.europa.eu/info/news/energy-union-eu-supports-celtic-interconnector-and-baltic-synchronisation-project-policy-conference-interconnected-energy-grids-2019-dec-03_en